top of page

ESTABLISHED 1975

Industry-standard for Government and private organizations power solutions and testing for over 4 decades.

NETALogo-4C-Process.jpg

THE BEST INSURANCE FOR YOUR ELECTRICAL INVESTMENT

Shared values guided by certified NETA standards and safety procedures create the opportunity for us to judge our actions from a common framework for over 50 years in the power testing industry.

powerroom5.JPG
american-public-power-association-dR3Fb6dBEc0-unsplash (1).jpg
thisisengineering-raeng-t4qI2IDcL5s-unsplash.jpg
powertestingflir3.JPG

ACCEPTANCE TESTING

MAINTENANCE TESTING

ENGINEERING AND SYSTEM COMMISSIONING

SHOP SERVICES

TESTING

24 HOUR
EMERGENCY SERVICE

ELECTRICAL ANALYSYS

"Load monitoring", "power quality," and "harmonic analysis" is a sign of the times. With the critical nature of today's electronic equipment, the electrical environment plays an important role in its operation. Using state-of-the-art instrumentation, our professional engineering staff can diagnose the problems and provide you with cost-effective solutions.

ARC FLASH HAZARD ANALYSIS

Arc Flash is the result of rapid release of energy due to an arching fault between a phase bus bar another phase bus bar, neutral or a ground. The arc flash hazard analysis study is conducted by an electrical engineer skilled in performing and interpreting power system studies. Study data for Arc Flash Hazard Analysis can come from many sources, such as present and future utility feeds, or motors and generators.

ELECTRICAL FIELD SERVICES

Scheduled or Emergency Services

Image by Possessed Photography
PngItem_3679964.png

Why Power Systems Testing and Engineering

50 Years in power testing industry

Government Approved Contractor

NETA Certified

Independent Testing

24 Hour Emergency Services

Engineering Services

We service all of California 

Offices in Northern, Central and Southern California

Contact
bottom of page